Mold Removal in Laguna Hills, California
The objective of the cleaning is to remove excess dust, moisture, and residual mold spores.” Our intended scope of work includes the Isolation of the contaminated area(s) in 6 mil polyethylene sheeting as well as the sealing of all seems and openings. We will be removing the recommended ceiling drywall in the Living Room. During the isolation period, contaminated areas will be set under negative air pressure in order to effectively purify the air of harmful spores and mycotoxins. All non porous materials will be treated in a green antimicrobial solution and HEPA vacuumed per the outlined protocol that was written by Patriot. All relevant dust during the sanding phase will be HEPA vacuumed. Due to the extent of the damage, the previously mentioned remediation process will take approximately 4 to 6 full days to complete.