Water Damage Repair in Dana Point, CA
All cabinets and walls demo have been completed. There’s about 15 ft.² or less of engineer hardwood glue down flooring the needs to be removed and I don’t think we have tested it can we please schedule that? Right now I’m about to conclude my three stage wipe down before sitting up drying equipment. Please set up pick up of equipment for Monday since I anticipate for the studs and framing to be dry by then. If we have approval for floor removal and results came back negative we still wouldn’t need any drain equipment since once we remove the flooring that will be the end of the job.