This job involved fire and smoke damage remediation at 28113 Via Luis, Laguna Niguel, CA 92677. Work began on August 11, 2026, with the installation of protective floor coverings and containment barriers in the living room and bedroom, followed by the removal of affected drywall and insulation. Demolition and initial cleaning continued on August 12, including HEPA vacuuming, antimicrobial wipe-downs, and the installation of air filtration and dehumidification equipment. On August 17, the equipment was removed, exposed wall cavities were sealed, and environmental sampling was conducted. Following the testing results, additional HEPA vacuuming and antimicrobial cleaning were performed in the dining room on August 28. The majority of the work was recorded as completed on September 4, 2026, with the job’s formal completion documentation dated October 21, 2026.